Product Guide BEHI-SPLIT (leg or wrist)
- In the beginning, open the envelope on the location marked on depending .
-
Select a desired size of BEHI-SPLIT and remove from foil pouch
(for roll type, cut to desired length and immediately reseal remaining in the foil pouch with clip) - Roll the splint and squeeze out the excess water
- Lay the splint on a towel and roll snugly and squeeze to remove remaining water
- Apply the splint on desired area of the patient and wrap with elastic bandage
- Moulding and forming should be done at this time
- Setting Time is approximately 3-4 minutes
- Functional strength will be achieved in 20 minutes
-
Step 1
-
Step 2
-
Step 3
-
Step 4
-
Step 5
-
Step 6
-
Step 7
-
Step 8
-
Step 9
-
Step 10
-
Step 11
-
Step 12
-
Step 13
-
Step 14
-
Step 15
-
Step 16